oga

oga logo

900 848 508

Blog

OGA Assembly-Production Lines and Downstream Logistics

Assembly-Production Lines and Downstream Logistics, independent problems?

Considerations about the problems of Task Sequencing (Scheduling) and Vehicle Routing (Routing), especially in scenarios of continuous production of goods that must be subsequently delivered to customers, surely with very strict time windows.

How can a digital twin of a business process help me?

How can a digital twin of a business process help me?

How can a digital twin of a business process help me? Introduction In a previous post we have introduced the main concepts of a digital twin, and one of the ones that appeared was that of being linked to a real physical object. Therefore, the first question that arises is,…